Self Check Answers
Self Check Answers
- DEABCD; .
- The edges are added in the order DE, DA, AB, BC, and CE. One way to represent this tour is ABCEDA, and the cost of the tour is 4.8.
- The edges to form the minimum-cost spanning are added in the order St. Louis–Chicago, Chicago–Cleveland, and Chicago–Minneapolis. The cost for the tree is 1074.
- The tasks on the critical path are T1, T2, T3, and T4. The job consisting of all the tasks cannot be completed before time 27.