11.48 Adjusting the analysis for potential outliers. The examination of the residuals in part (c) of the previous exercise suggests that there may be two outliers, one with a high residual and one with a low residual.
(a) Because of safety issues, we are more concerned about underestimating PCB in a specimen than about overestimating. Give the specimen number for each of the two suspected outliers. Which one corresponds to an overestimate of PCB?
(b) Rerun the analysis with the two suspected outliers deleted, summarize these results, and compare them with those you obtained in the previous exercise.